PRODUCTION ENGINEERING

Oilfield Production Engineering and Consulting

Production Engineering Services  

The Basin team approaches production projects with the mindset of increasing production while minimizing lifting costs.    

From initial analysis to well bore intervention and everything in between, the Basin team is ready to assist you with your production project.  

While every Basin engineer, consultant and supervisor brings vast experience to your project, each serves as a gateway to the collective knowledge base of the entire Basin Engineering organization.  

Production Services

  • Flowback and Choke Management
  • Frac Interference Recovery
  • Artificial Lift Optimization
  • Nodal Analysis
  • LOE Management
  • Deviated Rod Design
  • Enhanced Natural Gas Separation in Horizontal Wells
  • Production Facility Design 
  • Wellbore Intervention / Fishing Operations
  • Remedial Workover Operations
  • Production Chemical Optimization
  • Electric Utility Optimization
  • SWD Operations

Talk with Travis About Your Project

Travis Gray, Senior Production Engineer

Every day Travis answers calls that start with "Whad'ya think about..."  Some are from clients, other are from industry colleagues who understand that a five minute call with Travis can  translate to thousands of dollars of savings. 

Travis thrives on challenge:  From resolving operational problems in the well to designing approaches to avoid problems.  Travis relies on his broad production experience across multiple basins to identify the best solutions. 

While people reach out to Travis for problem solving, what keeps them coming back is his focus on relationship development.  He understands that relationships are built on trust, and communication is critical.  For Travis, communication is common sense.  

Quick Case Study
13,000 foot horizontal pumping application.

The Basin production engineering team is frequently called upon for their expertise in pumping horizontal well bores.  

A recent project challenged us to engineer and implement an artificial lift solution for a 13,000 foot measured depth horizontal rod pump.

Located in the STACK play, the total measured depth of this project approached the outer limits of known horizontal rod pump capabilities.  

Our team successfully designed and implemented a horizontal rod pump solution that allowed the operator to minimize gas interference while maximizing well production.  

How can Basin Engineering help you with your next project?  Let's talk.  Call us at 405-288-0808