Long-term client and independent operator identified locations in NW Oklahoma for development. They turned to Basin Engineering for help with the project management.
Basin worked collaboratively with our client to plan the drilling and completion. The two-well pad with simultaneous drilling rig and fracture stimulation operations was meticulously designed to capture economies of scale. Basin's team directed and closely monitored the drilling and fracing operations.
The wells were successfully drilled and completed according to plan, allowing the operator to capture significant cost reduction from the multi-well site compared to drilling each well on separate pads and sites.